1. timber floor for three bedrooms
2. new colour bond fence around 14m in length
3. brand new main toilet
3.1 tile for floor and walls
3.2 new paint for ceiling
3.3 repair bath heater on the ceiling
3.4 new bath tub and new location
3.5 new shower screen
3.6 new taps
3.7 new lights beside the mirror
4. replace the tile inside the shower screen in the en suite
5. replace the broken window on the main door
6. uninstall the broken air conditioner and install a glass in Huanhuan's bedroom.
2. new colour bond fence around 14m in length
3. brand new main toilet
3.1 tile for floor and walls
3.2 new paint for ceiling
3.3 repair bath heater on the ceiling
3.4 new bath tub and new location
3.5 new shower screen
3.6 new taps
3.7 new lights beside the mirror
4. replace the tile inside the shower screen in the en suite
5. replace the broken window on the main door
6. uninstall the broken air conditioner and install a glass in Huanhuan's bedroom.